Walmart Case-Ready Beef Facility

Project Case Study
McCownGordon was selected as the design-builder for Walmart's 330,000-square-foot state-of-the-art, high-volume case-ready beef facility.

Client

Walmart

Processes

Design-Build
Engineering
Preconstruction
Building Information Modeling
Safety

City

Olathe, KS

The facility combines the latest in meat production design with the best packaging and material handling systems. This facility includes raw material storage, track and trace, wet and dry processing, palletizing, and finish product handling systems. It also features cold storage (freezer -10F and blast freezer -45F) and equipment for cutting/packaging beef.

 

READ MORE ABOUT THE PROJECT HERE. 
default
default